Aerial in harsh environment – point-to-point links Aerial distribution networks often have to endure extreme environmental conditions. Installation and maintenance work therefore need to be managed quickly and easily using pre-connectorised harsh connector solutions. During the installation phase, a connection is spanned from the fiber concentration point to the Masterline Ultimate (MLU) enclosure on the last pole near the homes. This is achieved either with an ADSS cable or a spiral carrier on a steel tension cable holding an outdoor fiber cable. During the second phase, new subscribers are attached with a pre-connectorised jumper cable plugged into a spare fiber port which is then spanned to their homes. At the Building Entry Point (BEP), the overlength can be keptin an overlength box and connected or cut and spliced to the in-home optical network. 1, 2 and 4 fiber distributions per home are supported. Field Mountable Connector › page 61 Double jacket cable › page 57 Pole enclosure MLU-Fiber › page 45 Street cabinet › page 41 Fiber cable 4F, 12F ADSS › page 56 Jumper cable 12F Q-ODC12 › page 45 16 HUBER+SUHNER Access network and FTTx Straining clamp › page 46
Print
Download PDF file
Build your own flipbook